The Legal Documentation Required For A House Extension In Scotland

August 7, 2019 General

When faced with the need for a change of or increase in space, many homeowners will decide to extend or adapt the existing layout of their property, often increasing its kerb appeal and market value in the process.

Before embarking on such a project, it is important to make sure that you have all the appropriate consents in place. From Planning Permission to Building Warrants, this article explores the key points to bear in mind.

You will likely need Planning Permission if you want to build something new, make certain changes to your land or the exterior of your property or change the use of your land or property (for example from waste ground to garden ground, or from residential to one of the many kinds of commercial use classes). Not all work will need Planning Permission, however; some work can be carried out without it.

In certain circumstances you will also need to obtain additional consent from the planning authority (such as if your property is or forms part of a Listed Building or is in a Conservation Area) and it is important that you establish this before you proceed.

You can apply for Planning Permission either directly to your local planning authority or via the Scottish Government’s ePlanning website. Through this website, you can:

There is a fee for the Planning Permission application. When you apply for Planning Permission, your local planning authority will carry out a process of notifying certain neighbours in writing of your planning application.

If your application for Planning Permission is declined, and this was submitted via ePlanning, you will be able to find out on the ePlanning website. Otherwise your local planning authority will write to you to confirm the outcome of your application. If you are unhappy with the decision, you can seek a review from the local review body. You can seek a review if your local application has been refused, or it has not been decided within the specified statutory time period (2 months).

To seek a review by the local review body, you must submit a Notice of Review which sets out why you wish the case to be reviewed. There are a number of circumstances where an appeal can be made to Scottish Ministers. These can be grouped into two broad categories:

To make an appeal you can fill in the online appeal form on the ePlanning website. You can also appeal on the Scottish Government website or by paper form.

If your application is a major application, you have the right to appeal to the Government.

If your application has not been determined within two months, you can seek a review from the local review body. You must do this by submitting a Notice of Review.

Even if you do not need Planning Permission you may still need a Building Warrant.

A Building Warrant is the consent granted by the Building Standards authority to carry out building work. If you do not have this before you start building work on your project, you could be fined. You can obtain an application form for a Building Warrant from your local Building Standards authority or the Scottish Government website.

When you apply, you will need to include your plans with the application. These plans will almost always need to be prepared by an architect and should identify both the location of the work and the nature and extent of the work proposed.

There is a fee that you will need to pay based on the value of the work you are doing. Minor building work which requires a Building Warrant will carry a fee from £100 upwards.

Meeting building regulations

To make sure your proposed building work complies with the relevant Building Standards Regulations, you should check with your local Building Standards authority.

It is an offence to occupy a new building, or building that has been converted unless the Completion Certificate has been accepted by the local Building Standards authority. It is the responsibility of the relevant person (usually the owner or developer) to make sure that building work is done correctly, as the verifiers (i.e. officers from the Building Standards authority) cannot regularly or sufficiently monitor all construction work to check that the regulation requirements are being met.

The Completion Certificate must be signed by the relevant person who is normally the person on whose behalf the work is being carried out though in practice this may be their agent e.g. their contractor or architect.

Ultimately, anyone seeking to embark on a development project must ensure that they have all the correct consents required at the outset. However overwhelming and confusing this may be, diligence will pay off in the long run as these documents will need to be produced whenever a property is sold.

Here at , we are a team of approachable, responsive, client-focused solicitors who pride ourselves on offering personalised, tailored advice. We offer an open door policy and legal services tailored to your needs and budgets. Our are here to make sure that any building work identified in a survey report for a property you are selling or purchasing is supported by the required consents.

Contact Us

Speak to one of our experience legal team, and get responsive, clear, and straightforward legal advice and support.

Get in touch

Copyright © Jones Whyte 2024 | SC738324 | All Rights Reserved.

We are authorised and regulated by the Law Society of Scotland (www.lawscot.org.uk) and Solicitors Regulation Authority (www.sra.org.uk)
A list of members of our firm is available upon request from our Registered Office at The Connect Building, 3rd Floor, 59 Bath Street, Glasgow, G2 2DH

Responsive Website Design, Development & Hosting by mtc.